Project description
Abiteye Community Power Station and Facilities Tie-in
- Client: Chevron Nigeria Limited
- Period: 2007 – 2008 (6 Months)
Brief Scope of Work:
- Installation of two Gas generators (ZAN-300 & ZAN-400)725KW & 415/11KV, 1500KVA Step up Transformer.
- 480V MCC / Switchgear system / PLC Systems.
- Instrument Charge panel, ESD, Fusible loop system, Safety shut down system.
- Installation of Gas Scrubber for the two gas generators with associated instrument fittings & tubing. and devices.
- Installation of Gaitronics equipment (For paging & PA systems) & Tie-In to exiting facilities. Installation of Earthing System and tie in to existing ground loop using cad weld moulds.
- Installation of smart sensors for combustible gas system and fire detector system in the generator building & MCC building.