Project description
Project 1 : Delta South Quarters (DSQ): Design, Procure, Fabrication & Installation of 480V DSQ MCC Building & Workshop Building and ALL Associated E&I Equipment and Parts.
- Client: Chevron Nigeria Ltd (Offshore)
- Duration: 2009 – 2010 (12 Months Duration)
The Work Scope involve Installation & Commissioning of the Followings Equipment:
- 480V MCC, 480V Switchgear panel
- 45KVA, Power Transformer (480V/208/120V)
- 10kVA Ametek UPS System / Battery Bank
- 15KVA By-pass transformer
- 200A Battery Charging System
- Cable Tray and Conduit System.
- LV Cable Pulling, Testing and Termination.
- Supply and installation of lighting Fittings (Normal & Emergency) lighting transformers and Distribution panels.