Project description
Provision & Installation of: Solar Lighting System and Power Distribution for Umusetti Well Head
Location Kwale Delta State.
Client : Pillar Oil Limited
Duration : June 2012 – July 2012 (2 Months)
Scope of Work, Briefly:
- Procurement of Solar Panels, Batteries, control switches etc.
- Fabrication of Lighting Poles
- Fabrication of Solar Panel Support Bracket
- Installation of Perimeter Fence Lighting
- Installation of Lighting Poles and Solar light fixtures
- Pre-Com & Commissioning.












