Project description
Supply and installation of HT/LT Electrical power distribution system Faith Academy School Egwi-Etche Port Harcourt Rivers State.
Client : Living Faith Church D-Line Port Harcourt.
Duration : Feb 2015 – April 2015 (2 Months)
Brief Scope of Work:
Detailed Engineering Design, Procure, Construction, Installation, Testing and Commissioning of the following Electrical Equipment:
- 2 x 750KVA Transformer
- 2 x 1000 A, 415 Low Voltage Switchgear
- 800A 4-way Feeder Pillar
- Copper & Aluminium Cables
DESCRIPTION OF SCOPE OF WORK
- Design, Procurement, Construction/Installation and Pre commissioning and commissioning assistant to PHED.
- Supply and installation of 33KV High Tension (HT) Power Line to Faith Academy School premises.
- Supply and Installation of 415V Low Tension (LT) distribution power lines to each of the buildings within Faith Academy school premises
- Supply and Installation of
- 2 x 750KVA Transformers substation
- Line Isolator,
- Feeder pillars
- LV Distribution panels,
- Switchgear units,
- Sub-station grounding System (Earthing).
- Provision of substation Chain Link Fence with Steel gate.
- Supply and Installation of 250W perimeter Light fittings mounted on installed Electric Concrete poles.
- Provide commissioning assistance for hook-up of 33kv Line to National Grid through PHED
- Supply of 400W Metal Halide light fixture (16 Nos)