Project description
Client: Chevron Nigeria Limited
Contract : AFE 61024-41
Duration : 12 months.
Scope of Work Briefly
A ELECTRICAL Installation, Part Supply,
Testing and Commissioning of the following
Electrical Equipment.:
- 480V MCC, 480V, 208V, & 120V, Distribution and Lighting Panels.
- Cable Tray and Conduit System.
- Cable Pulling, Testing and Termination for 33KV, 11KV and 600V Power Cables from 3C x 240mm2 downward.
- Area and Street Lighting Installations. including supply and installation lighting transformers and panels.
- Power Transformer & Switch gear Sub-Station and Earthing system.
INSTRUMENTATION SCOPE
Calibration, Installation, Part Supply, Testing and Commissioning of the following Instrumentation systems/equipment
- Field Instrument
Calibration, Installation and Hook-up of different field instrument, such as pressure flow and level Transmitters, pressure, flow, level and temperature controlling devices with associated tubing, connections and terminations. - JBs and Local Instrument Panels
Mounting / Installation and Connection of Local JBs and Instrument Panels. - Emergency Shutdown System
Installation and Hook-up of emergency shutdown system comprising emergency shutdown stations and connecting tubing and cabling.